Building the new steps at Villa Renata
December 2007
This is what it all looked like at the start.

9th February 2008
and this is what it looks like now.

Scroll down to the bottom to see the work in order.
7th February 2008

The steps are finished, the wall rendered, the back wall made good... but, is this really right? (Click on the image to see more clearly)
5th February 2008

Now we can start on the top steps. The large square paving stone on the bottom step is neatly hiding the inspection chimney for the 1st chamber of the septic tank.

At last, the lower steps are all completed, and they look really good!
2nd February 2008

Back at work, but what happened to that tidy terrace?

We can see the shape of the lower steps
24th January 2008

At last, the shape of things to come. But sadly no more work for a week due to a family bereavement.
22nd January 2008

We built a wall at the side of the steps on the naya. This hides the drain pipe and could be a good site for a barbecue in the future.

The foundation was reinforced with mesh.
19th January 2008

A good solid ramp was laid as a foundation for the steps. It was also a good place for a lot of the rubble from digging up the rest of the old naya.
18th January 2008

After raising the upper terrace and sorting out the drains and access to the septic tank (under the garden to the right of the photo) work starts on building the base of the steps.
Labels: Continuing refurbishment at Villa Renata in Javea, Javea building, Javea Villa Rental, Villa Rental, Villas