Tuesday, 6 May 2008

Central Heating Installation at Ines Isabel, Javea, Spain

Boiler fitted in garage. The big hole goes in under the villa The cental heating installation at Villa Ines Isabel in Javea is now nearly finished. All the pipework is in, the boiler is fitted, and the gas cupboard nearly finished. The whole system has been pressure tested.



Back bedroom wardrobe. All heating pipes come up through here. Hot water feed to upstairs shower room also comes through here.The feed comes from the boiler via the back bedroom wardrobe. From there pipes feed up to the passage, along and under the lounge floor and then back down to the end bedroom wardrobe for that bedroom and the bathroom. All the pipes in the wardrobes will be covered by the wardrobe cladding.



Hot water for the upstairs shower room also comes from the boiler in the garage, and the new gas bottles supply the water heater for the back bathroom.




All the central heating and hot water pipes are clad with insulation

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home