Wednesday, 20 February 2008

Roof nearly finished at Trencal

20th February 2008
The two end sections are now completed.









Work is continuing very fast on the roof at Trencal. With four men working they hope to be finished by the end of the weekend.

Continuing the tiling at Renata

The gardener needs to trim the plants in front of the naya, to the yellow line, so that the builders can make good the edge of the naya. The stone facing below will also need attention soon.




The frames are in for the door and shutter from the lounge to the new outer terrace. Fortunately there are two spare tiles to replace the ones that had to be taken out. These were damaged by the removal of the stone that went deep down the wall.



The tiles are now down in the passage and covered naya areas. The whole area looks MUCH bigger with the lighter coloured tiles.